
The Fuller Middle School is a new, three-story school with a multistory common atrium area in its center, with classrooms abutting along the edges with study pods located throughout.
Our systems design includes a high-efficiency gas-fired boiler plant, high-efficiency air-cooled chiller plant, energy recovery air handling units, displacement ventilation, building energy management system, high-efficiency lighting, and controls, daylight harvesting, fire alarm with mass notification system, electrical vehicle charging infrastructure, and provisions for a photovoltaic solar array system.
Project highlights
- Architect
- Jonathan Levi Architects, LLP
- Size
- 137,0000 SF
- Value
- $78.5 Million
- Complete
- August 2021
- Award
- LEED Silver Certified

Next Project
Holbrook PreK-12 School
245 S. Franklin Street, Holbrook, MA 01343
