
The first new firehouse built in the City of Boston in over 25+ years; "a state-of-the-art facility" for our men and women firefighters.
GGD provided engineering design services for Fire Protection, Plumbing, HVAC, Electrical, Security, and Technology systems.
The design includes high-efficiency HVAC systems and equipment such as a heat recovery variable refrigerant flow system, condensing boilers, vehicle exhaust capture system, and automatic temperature controls, and building management system. Other efficient systems include lighting and controls, diesel-fueled generator, uninterruptible power systems, variable frequency drives, two-way communications call boxes systems, water and gas sub-meters, recirculating hot water pumps, and low flow plumbing fixtures.
Project highlights
- Architect
- Dore + Whittier
- Size
- 23,622 SF
- Value
- $23.5 Million
- Complete
- November 2021

Next Project
Dedham Public Safety
26 Bryant Street, Dedham, MA
